CIP

Clean In Place
Preparation Stages Initial Stage
Caustic Hot Water
Second Stage
Caustic Hot Water
Lye Tank Capacity Ltr
Initial Temperature 0C
Final Temperature 0C
Steam Pressure bar g
Time Required Min
Steam Consumed Kg
Steam Flowrate Kg/hr
Total Steam
Consumed
for Preparation Stage
kg
Peak Flowrate of
Steam for Preparation
Stage
kg/hr
Circulation Stage
Caustic Hot Water

Caustic Hot Water
Circula.Flow rate kg/hr
Initial Temperature 0C
Final Temperature 0C
Steam Pressure bar g
Time Required Min
Steam Flowrate Kg/hr
Steam Consumed Kg
Total Steam Consumed for Preparation Stage kg
Peak Flowrate of Steam for Preparation Stage kg/hr
Loss in Existing Steam System
Steam Trap Status
Trap By-pass valve Status
By-pass Valve size mm
Percentage of
By-pass Opening
%
Temperature overshoot 0C
Total Steam Loss with
Current Hook-Up
kg